MTA warns pauses to 24/7 subway service needed to modernize subways

Discussion in 'Commuter Rail and Rail Transit Discussion' started by Thirdrail7, Sep 22, 2019.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

  1. Sep 22, 2019 #1

    Thirdrail7

    T

    Thirdrail7

    Conductor

    Joined:
    Jul 9, 2014
    Messages:
    4,017
    The city that never sleeps will need a lot more taxi and Uber drivers.

    https://www.nydailynews.com/new-yor...0190916-agxkcr4ii5caphgcsrmghgxyzy-story.html

     
  2. Sep 22, 2019 #2

    Anderson

    A

    Anderson

    Conductor

    Joined:
    Nov 17, 2010
    Messages:
    9,215
    Location:
    Virginia
    I mean, given all of the issues and given the size of the system I have to wonder if it wouldn't have just made more sense in the scheme of things to simply support a base of bespoke parts suppliers (which would be a convenient way to handle political payoffs, I'd note...somehow I don't think there's a "market rate" for electromechanical switches circa 1930) than to mess with things. Yes, I know I very much tend towards the "If it ain't broke don't fix it" side of things but the degree to which the MTA has made a dog's breakfast of upgrading the system really brings to mind the question of whether it is worth it.
     
  3. Oct 9, 2019 #3

    neroden

    n

    neroden

    Conductor

    Joined:
    Feb 23, 2014
    Messages:
    7,337
    Location:
    Ithaca, NY
    There's a lot to be said for replacing the antique signalling systems with something modern. It's painful but London's been doing it one line at a time, and it's well worth it.

    You *do* have to have actual maintenance shutdown windows in order to maintain *any* system. The most efficient way to do it is London's "blockade" system where an entire section of line is shut down for a few weeks to be totally reconstructed. New York seems congenitally allergic to that, so overnight or weekend closures may be the only option; these take much longer due to the deploy/clean up/deploy cycle. However, the "blockade" system really is a good idea and would actually work better in parts of NY than in London, due to the high redundancy of the NYC Subway system. The hard ones are the lines which don't have redundant lines a block away, but the lines in Manhattan below Central Park, you really could do it.
     
    Pere Flyer and jis like this.
  4. Oct 9, 2019 #4

    Pere Flyer

    Pere Flyer

    Pere Flyer

    Lead Service Attendant

    Joined:
    Dec 25, 2016
    Messages:
    355
    Location:
    Providence, R.I.; Grand Rapids, Mich.
    If NYCT were to operate a night bus network with equally convenient service like most metro operators around the world, shutting down the subway at night for much-needed repairs wouldn’t be such a big deal. (And given the agency’s share of stairs-only subway stations, a night bus network would be more accessible, de facto.)
     
    daybeers and NorthShore like this.
  5. Oct 10, 2019 #5

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,179
    Location:
    South Carolina
    What about just single tracking the lines. The frequency takes a major hit. But it would allow one track to be worked on. Then move to the next eventually.
     
    Pere Flyer likes this.
  6. Oct 10, 2019 #6

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,752
    Location:
    Space Coast, Florida, Area code 3-2-1
    The track layout and the available signal system makes that more or less infeasible in case of New York City Transit. It will first require replacement of the signaling system, which is exactly what requires the taking segments out of service overnight in the first place.
     
    Pere Flyer likes this.
  7. Oct 10, 2019 #7

    PVD

    P

    PVD

    Conductor AU Supporter

    Joined:
    Jul 8, 2015
    Messages:
    4,160
    Location:
    NYC/Queens
    Working adjacent to live track with energized 3rd rail adds additional safety considerations that slow down work and limit who can be there which adds cost and slows down work considerably.
     
    Pere Flyer and jis like this.
  8. Oct 16, 2019 at 1:14 AM #8

    Metra Electric Rider

    M

    Metra Electric Rider

    OBS Chief

    Joined:
    Mar 10, 2016
    Messages:
    757
    Isn't New York more subway dependent than say Chicago (which, despite our rail systems, is still fairly bus dependent)? Hence subways shutdowns have a greater affect (or is that effect) than elsewhere, in addition to car ownership stats.
     
    NorthShore likes this.
  9. Oct 16, 2019 at 4:19 AM #9

    railiner

    railiner

    railiner

    Conductor

    Joined:
    Mar 20, 2009
    Messages:
    7,286
    Location:
    South Florida
    What I don't understand, is how in the first half century or so of subway operation in New York, they seemed to be able to maintain the system, while keeping service running 24/7. It is only in the last half century or so, that you see them shutting down entire lines or large portions, overnight and on weekends. I suppose that what they are doing now is a lot more extensive than what they did in the past.....
     
  10. Oct 16, 2019 at 4:20 PM #10

    drdumont

    drdumont

    drdumont

    Service Attendant AU Supporter

    Joined:
    Apr 16, 2017
    Messages:
    120
    Location:
    The Great (and may I add) Sovereign State of TEXAS
    Well thought out, but I believe in the current instance, they plan to remove the old signalling and control system and replace it with newfangled technology. Wile I presume a lot of the signalling and flow control could be left to run on the old system while the physical side of the new system is installed, but disconnecting the old, connecting and testing the new, and having to try to run a hybrid system during the week until the new system is completely confident and running is a huge time consuming effort.
    I'm currently in the middle of a similar albeit smaller situation, keeping an older switching and automation system (interconnected and interdependent) for two tv stations running while paralleling a new switching system and a new automation system (the new ones will not be as interdependent, but will be interconnected).
    Of course, while juggling them will take quite a lot of time and involve a lot of tsouris, no one will die if there is a mistake.
    Athough the sales department might differ in their opinion of the latter.
    And I don't have to work in a dark, hot, smelly, vermin infested environment. Unless you include the sales department...
     
    Pere Flyer likes this.
  11. Oct 16, 2019 at 6:12 PM #11

    MikefromCrete

    M

    MikefromCrete

    Conductor

    Joined:
    Mar 24, 2009
    Messages:
    2,529
    Location:
    Crete, IL
    Perhaps the system wasn't maintained all that well, leading to today's problems.
     
  12. Oct 16, 2019 at 6:20 PM #12

    DCAKen

    D

    DCAKen

    Train Attendant

    Joined:
    Jun 24, 2015
    Messages:
    86
    And there are many more safety regulations to follow these days.
     
  13. Oct 16, 2019 at 7:30 PM #13

    railiner

    railiner

    railiner

    Conductor

    Joined:
    Mar 20, 2009
    Messages:
    7,286
    Location:
    South Florida
    I believe the system was pretty well maintained, until maybe around the seventies, or so...and then city fiscal troubles may have entered into the problem of deferred maintenance... I have no facts to substantiate that, just my feeling.

    I agree that worker safety is taken more seriously nowadays's, and of course, that's a good thing.

    I will say that nowaday's, they have advanced equipment to perform a lot of the maintenance, that weren't around in the early days....
     
  14. Oct 17, 2019 at 1:39 AM #14

    Metra Electric Rider

    M

    Metra Electric Rider

    OBS Chief

    Joined:
    Mar 10, 2016
    Messages:
    757
    I would think that, if not replaced already, some of the moving and non-moving parts is or has (or is way past it's due date) approached the end of their useful lifespans - even if well maintain some things just simply wear out eventually. The saltwater flooding tunnels didn't help during Sandy either.
     
  15. Oct 17, 2019 at 6:44 PM #15

    drdumont

    drdumont

    drdumont

    Service Attendant AU Supporter

    Joined:
    Apr 16, 2017
    Messages:
    120
    Location:
    The Great (and may I add) Sovereign State of TEXAS
    I think New York is still suffering the long term effects of the "deferred maintenance" in the past. No doubt the subway system is included in the suffering.
    When I had to use the subways in the 70s and 80s, at first it was really Godawful. Filthy, smelly, nothing but graffiti.
    The last time I was on the subway it was wayyy improved. Kudos to the system operators. But I imagine after Sandy they still have a long row to hoe.
    I'm willing to bet that after all is done, in spite of the temporary inconveniences, the result will be greatly improved service.
     
  16. Oct 17, 2019 at 9:57 PM #16

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,752
    Location:
    Space Coast, Florida, Area code 3-2-1
    But I thought this proposed overnight shutdown has a lot to do with replacing the electro-mechanical interlocking and train protection by CBTC, something that is hard and expensive to do while maintaining service. And while one is at it track rebuilding is also a good thing to do after a hundred years.
     
  17. Oct 17, 2019 at 11:49 PM #17

    drdumont

    drdumont

    drdumont

    Service Attendant AU Supporter

    Joined:
    Apr 16, 2017
    Messages:
    120
    Location:
    The Great (and may I add) Sovereign State of TEXAS
    My point exactly...
    New technology, new track, a clean sweepdown fore and aft, maybe LED lamps to replace fluorescents, a little paint, some throw pillows...
     
    Pere Flyer likes this.
  18. Oct 18, 2019 at 2:20 PM #18

    MARC Rider

    M

    MARC Rider

    Conductor

    Joined:
    Apr 5, 2011
    Messages:
    1,291
    Location:
    Baltimore. MD
    I think the improvement happened sometime in the mid-1980s. I visited someone in 1984, and she complained bitterly about how unreliable they were. They were also full of graffiti, smelly, and, in the summer, the cars were sweatboxes, as none had AC. I didn't go to New York for a few years and then returned in 1987. It was like night and day. Air conditioned subway cars, all the mess cleaned up, no delays. Almost thought I was was in Tokyo or something. :)
     
    Bob Dylan likes this.
  19. Oct 18, 2019 at 7:48 PM #19

    railiner

    railiner

    railiner

    Conductor

    Joined:
    Mar 20, 2009
    Messages:
    7,286
    Location:
    South Florida
    I think it turned around for the better, when David Gunn took over...
     