JohannFarley
Service Attendant
- Joined
- Jan 16, 2016
- Messages
- 130
Had a couple of problems today on the Lake Shore Limited from Chicago heading back to New York. After Syracuse, one for the two engines had "computer issues," grounding us there for roughly an hour, making our rather on time train an hour and a half late into Albany. After we ditched the Boston section, we get our new engine, and leave Albany about a half hour late. Make it just past Poughkeepsie and yet again, grounded for another 10 minutes with a "computer glitch in this high tech locomotive" as the conductor put it. Is this a common problem with these engines? 2 separate failures on 2 separate engines.
Last edited by a moderator: