R railiner Engineer Joined Mar 20, 2009 Messages 11,091 Location X Oct 2, 2013 #2 Hope it gets completed faster than the Second Avenue Subway...........
W WinNix Train Attendant Joined Aug 14, 2011 Messages 59 Oct 3, 2013 #3 railiner said: Hope it gets completed faster than the Second Avenue Subway........... Click to expand... HA! No kidding! Wait, did you mean the recent timeline, or the overall timeline from the 1972 - today? I really hope not the latter!
railiner said: Hope it gets completed faster than the Second Avenue Subway........... Click to expand... HA! No kidding! Wait, did you mean the recent timeline, or the overall timeline from the 1972 - today? I really hope not the latter!
jis Permanent Way Inspector Staff member Administator Moderator AU Supporting Member Gathering Team Member Joined Aug 24, 2003 Messages 39,541 Location Space Coast, Florida, Area code 3-2-1 Oct 3, 2013 #4 It is one thing to talk about how soon the tunnel box would be completed, which should be pretty soon. As for the whole tunnel, no one has even suggested that it would be done anytime before 2025 or so. Just to set expectations properly....
It is one thing to talk about how soon the tunnel box would be completed, which should be pretty soon. As for the whole tunnel, no one has even suggested that it would be done anytime before 2025 or so. Just to set expectations properly....
A Andrew Guest Oct 3, 2013 #5 1. What is the chance that the Gateway Project gets completed--but that a Bergen Loop is not included or constructed? 2. Does anyone know if AECOM recently received a large Gateway contract?
1. What is the chance that the Gateway Project gets completed--but that a Bergen Loop is not included or constructed? 2. Does anyone know if AECOM recently received a large Gateway contract?