Here is FRA's latest status report on the Five Carriers it considers to be at risk of missing the December 31 deadline:
https://www.fra.dot.gov/Media/File/1326
Apparently Amtrak has been a little behind in getting all the hardware installed on the Empire Corridor, or something like that.
It is good to see that several of the outfits that were causing a scare, like MNRR, SFRTA (Tri-Rail), CFRC (SunRail), FECR (FEC and Brightline) etc. are not on the "at risk" list anymore.
Oddly NMRX (Rail Runner) is not to be found on FRA's PTC Dashboard list either leaving one wondering what the heck is going on in Albuquerque.
https://www.fra.dot.gov/Media/File/1326
Apparently Amtrak has been a little behind in getting all the hardware installed on the Empire Corridor, or something like that.
It is good to see that several of the outfits that were causing a scare, like MNRR, SFRTA (Tri-Rail), CFRC (SunRail), FECR (FEC and Brightline) etc. are not on the "at risk" list anymore.
Oddly NMRX (Rail Runner) is not to be found on FRA's PTC Dashboard list either leaving one wondering what the heck is going on in Albuquerque.