seat38a
Engineer
Pacific Surfliner train 591 has been chronically late. It was up to last week scheduled to leave San Diego at 6:15PM for LAX but is always late due to the train from LAX never arriving on time. So, as of last week, they officially changed the time departure time from San Diego to 6:45 PM, the actual time that 591 departed San Diego 95% of the time. So now, the train that is always late, is 99% on time. I'm sure it is easier to adjust the schedule on the LAX - SAN corridor since most of the tracks are NOT owned by the freight railroads. Is manipulating the schedule like train 591 a common practice? If late all the time, change the time and make it on time.