seat38a
Engineer
I was going through the videos of the CS on youtube and ran into couple videos where the train is missing the PPC but has two SSL. I'm guessing this is a substitute for when the PPC is broken down and being repaired. During the substitution, do they still run it just like the PPC? Cafe downstairs used for selling wine, espresso etc.?