WoodyinNYC
Conductor
Thanks for this news!
Maybe I'd better lie down for a few minutes and collect myself.
Well, it gives me a titillation of an almost pornographic degree :giggle: to conjecture that the FRA has an answer for you! And they're hurrying the Record of Decision and everything else because they want somehow to make irrevocable spending commitments before January 20, 2017.The tunnel replacement study has advanced to settling on a revised Alternative 3B route.
Since the FRA is the lead on the EIS, one would venture that the FRA can fast track the official Record Of Decision. So if there is a ROD in early to mid-2017, where does the $4 billion come from the build the new Baltimore tunnels?WASHINGTON – The Federal Railroad Administration (FRA) today presented a revised proposal to replace the Civil War-era Baltimore and Potomac (B&P) Tunnel . . . two options have fallen (Alternative 3A and Alternative 3C) from consideration, and FRA will make several significant changes to Alternative 3B in the Final EIS.
....
The Final EIS, scheduled to be published later this year . . .
Maybe I'd better lie down for a few minutes and collect myself.
Last edited by a moderator: