In single track operation, the tunnels only have a capacity of 6 per hour compared to 24 per hour when both are open. That is reduction of 75%. Where did you read that single-tracking capacity is 8 per hour?If Amtrak thinks 8 slots instead of 24 per hour is 75% then that might explain why their accounting is so screwed up too.Shutting down one Hudson Tunnel reduces throughput by 66% not 75%.
/quote]
Amtrak claims 75%.
Or they may just be providing more dramatic slightly alternate facts for better effect.
http://www.nj.com/traffic/index.ssf/2015/06/the_nightmare_that_awaits_nj_if_a_hudson_rail_tunnel_is_forced_to_close.html
Last edited by a moderator: