Viewliner II - Part 1 - Initial Production and Delivery

Discussion in 'Amtrak Rail Discussion' started by PRR 60, Jan 29, 2012.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

Thread Status:
Not open for further replies.
  1. Feb 13, 2012 #51

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    The current VL's are limited to 110MPH. Heritage or No Heritage.
     
  2. Feb 14, 2012 #52

    AlanB

    A

    AlanB

    Conductor Honored Member

    Joined:
    Aug 23, 2002
    Messages:
    28,406
    Location:
    Queens, New York
    Amtrak's P42's have a maximum rated speed of 110 MPH, so assuming that the cars being pulled don't limit things, then diesel hauled trains would max out at 110 MPH assuming that the track permits it.
     
  3. Feb 14, 2012 #53

    TCRT

    TCRT

    TCRT

    Lead Service Attendant

    Joined:
    Aug 20, 2011
    Messages:
    270
    Location:
    Cambridge, MA
    I recall seeing

    on youtube, which would appear to show a P42 running at 110mph on the Keystone, for example.
     
  4. Feb 14, 2012 #54

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    That's pretty much the only place in the Country where P42's and P40's can hit 110MPH. Although I don't know if they can actually hit 110MPH.
     
  5. Feb 14, 2012 #55

    AlanB

    A

    AlanB

    Conductor Honored Member

    Joined:
    Aug 23, 2002
    Messages:
    28,406
    Location:
    Queens, New York
    I've been behind P42's on the NEC back when for a while they were changing the LD and other trains going beyond DC engines in Philly, running electric only between NY & PHL. We did 110 MPH. And the engines are rated for that.

    Also as of last week, they're now doing 110MPH out in Michigan.
     
    Last edited by a moderator: Feb 14, 2012
  6. Feb 14, 2012 #56

    NE933

    N

    NE933

    Conductor

    Joined:
    Aug 17, 2005
    Messages:
    1,066
    Location:
    Queens, New York
    May I kindly request Alan B. to remove the erroneous subject line of this thread which says "...delivery is delayed until 2013...". This will cause a reader discouragement and is a faithkiller, something we need less of and not more.

    There is no delay so far. The first VII's will roll out near the end of this year for testing, then, will enter revenue services 1st quarter 2013. that has been the plan all along.

    Thank you.
     
  7. Feb 14, 2012 #57

    Peter KG6LSE

    Peter KG6LSE

    Peter KG6LSE

    Lead Service Attendant

    Joined:
    Jan 4, 2011
    Messages:
    433
    Location:
    WilsonVille OR 20 Min From PDX
    Off topic a tit bit .. but MAN that thing was Hauling Rear .. I need to get some mileage on that train ASAP ! ..

    and I thought 90 on the SWC was a trip .. Oh baby !

    Iam sorry but to see a non NEC train hit triple digits makes me all happy inside ..

     

     
     
  8. Feb 14, 2012 #58

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    I know you didn't read the article.. If you did you would see that CAF delayed the first delivery so they could get several cars out at once instead of just one.

    If you can prove that the article in the OP is a joke and a lie feel free to enlighten us on why not.
     
  9. Feb 14, 2012 #59

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    I was never able to get behind P40/42's on the NEC south of PHL.

    Why did they change power at PHL? I can't remember. Wasn't it something about power shortages?? Not to mention if this was the reason wasn't this in the peak of the AEM-7 reman project?? Which made the shortages worse. They had about 2 or 3 out for Reman at a time IIRC.
     
  10. Feb 14, 2012 #60

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,919
    Location:
    Space Coast, Florida, Area code 3-2-1
    As I recall, Paradise PA is not quite 110mph territory given the curves to the east. It is probably 90, maybe 100, but I could be wrong of course since I don't have an employee TT in front of me.
     
  11. Feb 14, 2012 #61

    Oldsmoboi

    Oldsmoboi

    Oldsmoboi

    OBS Chief

    Joined:
    Jan 4, 2011
    Messages:
    586
    Is there any press release for the 110 service starting in Michigan? I'd like to post it on my own site.
     
  12. Feb 14, 2012 #62

    Mackensen

    M

    Mackensen

    Lead Service Attendant

    Joined:
    Jul 30, 2009
    Messages:
    394
    Location:
    Lehigh Valley
    Here.
     
  13. Feb 14, 2012 #63

    NE933

    N

    NE933

    Conductor

    Joined:
    Aug 17, 2005
    Messages:
    1,066
    Location:
    Queens, New York
    No. You, kindly summon the specific citations of the Amtrak press release and compare them to the article, then I'll re-read the article, and one of us will enlighten the other after but not before the last qualifying thread.
     
  14. Feb 14, 2012 #64

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    Overall CAF has the final say on when cars are delivered. They're building them not Amtrak. I'm sure CAF conferred with Amtrak on this and Amtrak might have agreed with CAF. I would prefer a set of cars then just one car if I were in Joe Boardman's shoes. If that lone diner shows up at Penn Coach Yard in October then Amtrak was right. If they start showing up in 2013 then there's the proof that CAF is correct.
     
  15. Feb 14, 2012 #65

    Oldsmoboi

    Oldsmoboi

    Oldsmoboi

    OBS Chief

    Joined:
    Jan 4, 2011
    Messages:
    586
    Thank you, I help to get the word out as well on my site with my automotive readership (we're Detroit/Michigan focused) http://www.cheersandgears.com/page/index.html/_/articles/industry-news/michigan-gains-higher-speed-rail-service-r383
     
  16. Feb 14, 2012 #66

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,919
    Location:
    Space Coast, Florida, Area code 3-2-1
    I may be totally wrong about this, but I thought the confusion was mostly about whether the 2013 referred to calendar year 2013 or FY 2013. The latter would still place the first deliveries in calendar year 2012. Frankly I don't know the answer and 3 months this way or that probably does not matter that much. The early deliveries will be out testing and certifying for several months anyway before anything goes into service. It took NJT over 4 months from first delivery to first in service for the MLVs for example.
     
  17. Feb 14, 2012 #67

    NE933

    N

    NE933

    Conductor

    Joined:
    Aug 17, 2005
    Messages:
    1,066
    Location:
    Queens, New York
    That is the confusion I was talking about.
     
  18. Feb 14, 2012 #68

    afigg

    a

    afigg

    Conductor

    Joined:
    Jun 9, 2009
    Messages:
    5,896
    Location:
    Virginia
    Or the confusion could be that the first unit is to be delivered for initial testing, including being sent to Colorado for FRA trials, in October, but that the first batch of multiple units is scheduled for delivery after the first of the year. On the other hands, schedules and Gannt charts are made to be slipped.
     
  19. Feb 15, 2012 #69

    AlanB

    A

    AlanB

    Conductor Honored Member

    Joined:
    Aug 23, 2002
    Messages:
    28,406
    Location:
    Queens, New York
    There was a period in time back as the E60's were on their way out and the HHP-8's where just getting started and during that same point Amtrak was dealing with the Express Trak freight business. The AEM-7's couldn't handle the assignments because, IIRC, they could not communicate with FRED (Flashing Rear End Detector) that had to be used with the freight cars. So only the new HHP-8's which were having break-in problems and the aging E60's could pull trains on the NEC with freight on the bottom.

    So Amtrak in an effort to reduce the number of miles being put on the E60's would have them haul trains from NYP down to PHL. Then since Philly was already adding freight cars to the rear, they'd also cut off the E60 and pop on the P40/P42's needed for the rest of the journey.
     
  20. Feb 15, 2012 #70

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,554
    Location:
    In a Sea of Foam
    I knew it had to do with Power Shortages but I had forgot about the Expresstraks. I didn't realize that the Reefers used Freddy.
     
  21. Feb 16, 2013 #71

    dlagrua

    dlagrua

    dlagrua

    Conductor

    Joined:
    Nov 24, 2009
    Messages:
    3,052
    Location:
    Hillsborough, NJ
    Since 2013 is now here; its time to bring this topic back up to the top. I realize that the Viewliner II order is behind schedule but has anyone heard when the first units will go into service? IIRC the diners and baggage cars were due off the production line first. I just wonder if these cars will make their debut at NTD. That would be a fitting introduction.

    Comments?
     
  22. Feb 16, 2013 #72

    PRR 60

    PRR 60

    PRR 60

    Conductor Staff Member Administator Moderator

    Joined:
    Feb 18, 2003
    Messages:
    8,244
    Having the new cars in service will likely not happen until early 2014.

    The first prototype cars for testing are scheduled out late spring this year. Assuming the testing program finds nothing that requires major redesign, the first production cars should begin arriving in late this year or early 2014. The order should be fully delivered in 2015.
     
  23. Feb 17, 2013 #73
    Sometime in the last year, we found out that Amtrak is planning to get one of each type delivered for testing and validation (etc) before getting the rest delivered.

    I believe Amtrak is still anticipating putting those four cars into service sometime late in the 2013 calendar year, assuming there's nothing wrong with them -- perhaps around October. This is about a year's delay versus the original plan, which informed speculation says was related to difficulty on CAF's part finding welders who knew how to work with stainless steel.

    I'm quite certain Amtrak will put cars into service as soon as they're delivered and tested, rather than waiting until they have a whole bunch. From Amtrak's point of view, they need relief for the crumbling Heritage fleet ASAP. Consider that Amtrak actually deployed the 8400 prototype diner, which would not have been normal practice. At the moment it's just a question of when CAF delivers the "first four" cars, and how long Amtrak and the FRA take testing them. They've been extremely quiet about it so there's really no way to tell -- they could announce delivery as early as March or much later.
     
  24. Feb 17, 2013 #74

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,919
    Location:
    Space Coast, Florida, Area code 3-2-1
    What I have heard from usually reliable sources is that the delivery of the cars for test and certification will be in Fall 2013, with service entry most likely in early 2014. But of course only time will tell what actually happens.
     
  25. Feb 17, 2013 #75

    AlanB

    A

    AlanB

    Conductor Honored Member

    Joined:
    Aug 23, 2002
    Messages:
    28,406
    Location:
    Queens, New York
    Part of the reason for deploying 8400 was to ease the strain on the remaining Heritage diners a bit, not that one car does too much in that area.

    But the bigger reason for deploying it was to ensure that the fiasco of 8400's first iteration was not repeated. Amtrak wanted the crews to actually work this car so as to ensure that the kitchen layout was smartly designed from the view of the people who actually have to work the car, rather than the view of the designer who was only concerned with fitting everything into the space allotted and not with practicality. They wanted to be sure that they got it right this time, and before they had 25 cars with failed designs out on the road.

    In the first iteration of 8400 we had such wonderful things as the SA's needing to walk behind the cook at the grill making french toast or an omelet to get a glass of orange juice. From what I've heard from a few crews, while there are a few minor annoyances, by and large they got it right this time.

    While I've heard no mention of such a plan; it would not surprise me at all that if Amtrak goes ahead with the plan to buy all new modules for the existing 50 sleepers as a way to refurbish them, that they actually buy 51 sets of modules and return sleeper 62091 (aka 2300) to service also.

    The other original prototype sleeper 2300 is far too gone to ever be brought back. It resides in Wilmington where it continues to be used as a mock up for possible cafe cars and coaches.
     
Thread Status:
Not open for further replies.