RFP issued for Amfleet I replacement

Discussion in 'Amtrak Rail Discussion' started by keelhauled, Jan 18, 2019.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

  1. Apr 24, 2019 #176

    trainman74

    trainman74

    trainman74

    Conductor

    Joined:
    Apr 7, 2011
    Messages:
    1,560
    Location:
    Sherman Oaks, CA
    Thanks, sorry I sidetracked things by confusing the name being given to the car order with the name of one of the agencies involved.
     
  2. Apr 24, 2019 #177

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,293
    Location:
    South Carolina
    I have my own reasons for not wanting semi-permanent trainsets as well. The more of those we have the less places we can run. Which means less money for the industry and ultimately me. But that’s me being selfish.
     
  3. Apr 24, 2019 #178

    Acela150

    Acela150

    Acela150

    Conductor

    Joined:
    Jan 11, 2008
    Messages:
    8,622
    Location:
    In a Sea of Foam
    And your reasons IINM relate to PV, nothing related to what I mentioned which is way more justified.
     
  4. Apr 25, 2019 #179

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,293
    Location:
    South Carolina
    Like I said I’m very selfish. Even though I’m not a large fan for your reasons as well
     
  5. Apr 26, 2019 #180

    Thirdrail7

    T

    Thirdrail7

    Conductor AU Supporter

    Joined:
    Jul 9, 2014
    Messages:
    4,192
    Again, this depends on the type of service you wish to provide. There is a big difference between turn around commuter service and point to point, multi state service. Amtrak tends to fall into the latter. I'm not aware of any commuter service that operates 600+ miles...one way. I'm not aware of Chicagoland commuter service operating through 9 states...and potentially carrying mail, parcels and private cars.

    Additionally, adding another locomotive to your train increases costs and increases inspections.
     
    cirdan likes this.
  6. Apr 26, 2019 #181

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,293
    Location:
    South Carolina
    Just the thought of a 600 mile commute anywhere turns me off to whatever job.
     
    cirdan likes this.
  7. Apr 26, 2019 #182

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,235
    Location:
    Space Coast, Florida, Area code 3-2-1
    I guess my focus on using cabs at both ends of a train specifically in the context of NEC-like operations was not clear. I was talking mostly about NEC (or other) Regional type services, which is basically a higher class commuter service in most cases, even though over longer distances, and Acelas already use cabs at both ends, as does everything on Amtrak California.

    I agree with you to quite an extent about infrequent (once a day or less) service over longer distances. Specifically services that have 24 hour (or even 8 hour) layovers at each end, do not require quick turnaround, obviously.
     
    Last edited: Apr 26, 2019
  8. Oct 29, 2019 #183

    Andrew

    A

    Andrew

    Lead Service Attendant

    Joined:
    May 3, 2013
    Messages:
    416
    Rumor has it that the Hitachi Class 800 Dual Power Integrated Trainset is a strong contender for the Northeast Regional Trains that operate south of Washington, D.C, as well as the Pennsylvania which travels between Pittsburgh and NYC.
     
  9. Oct 29, 2019 #184

    mainemanman

    m

    mainemanman

    Train Attendant

    Joined:
    Apr 17, 2019
    Messages:
    22
    Where'd you hear that? Seems odd to use a British design.
     
  10. Oct 30, 2019 #185

    daybeers

    d

    daybeers

    OBS Chief

    Joined:
    Jan 6, 2016
    Messages:
    637
    Location:
    HFD
    When will Amtrak make its decision?
     
  11. Oct 30, 2019 #186

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,235
    Location:
    Space Coast, Florida, Area code 3-2-1
    Yeah. I don’t think Amtrak will go for British loading gauge.
     
  12. Oct 30, 2019 #187

    Andrew

    A

    Andrew

    Lead Service Attendant

    Joined:
    May 3, 2013
    Messages:
    416
    Final bids for the Amfleet Replacement are now due this November 20th.

    It would be cool to see coaches for the electric trains--such as the Keystones-- and a Dual Power Integrated Trainset for the trains which require an engine change.
     
  13. Oct 30, 2019 #188

    PerRock

    PerRock

    PerRock

    Conductor

    Joined:
    Sep 17, 2006
    Messages:
    1,842
    Location:
    Ann Arbor, MI
    Well the Class 800/801 is just the UK version of the Hitachi A-Train, so Amtrak would probably get an Americanized version of the A-Train. Just like how the new Acela is an Americanized version of Alstom's Avelia train.

    peter
     
  14. Oct 30, 2019 #189

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,235
    Location:
    Space Coast, Florida, Area code 3-2-1
    And also hope that Hitachi does not spend ten years trying to familiarize itself with American railroading practices
     
    seat38a likes this.
  15. Nov 3, 2019 #190

    Andrew

    A

    Andrew

    Lead Service Attendant

    Joined:
    May 3, 2013
    Messages:
    416
    For Amtrak trains that currently use Amfleet coaches, would it make more sense to use a dual powered locomotive, or a Dual-Powered Integrated Trainset, in the future?
     
  16. Nov 3, 2019 #191

    lordsigma

    l

    lordsigma

    OBS Chief

    Joined:
    Sep 16, 2017
    Messages:
    737
    How about a two pronged approach. You could do an EMU style for the BOS-WAS trains and Keystones, and then a traditional style fleet for corridor trains that currently need engine changes and for long distance trains. This would free up a lot of Sprinter electric locomotives. On the remaining traditional style equipment sets you could assign a dedicated sprinter and charger paired together that would just stay on the train all the time. I guess the disadvantage is you’d have to drag the inactive engine but it would eliminate the changes and would make use of assets they currently have. I’m sure given the manufacturing similarities between the Sprinter and Charger locomotives you could probably do it.
     
  17. Nov 3, 2019 #192

    PVD

    P

    PVD

    Conductor AU Supporter

    Joined:
    Jul 8, 2015
    Messages:
    4,240
    Location:
    NYC/Queens
    Since a BOS-WAS run involves 3 separate power systems, any EMU would be a bit pricey/complex. Dual modes tend to be less reliable than units that are one or the other. Neither is a show stopper, but must be considered.
     
  18. Nov 3, 2019 #193

    frequentflyer

    f

    frequentflyer

    OBS Chief

    Joined:
    Jun 10, 2008
    Messages:
    688
    Makes too much sense, Amtrak will not do it.......Its up an running the UK, most of the bugs have been worked out or at least identified.

    A Hitachi Regional will have Regional passengers not missing the Acela IIs amenities except for the extra "speed". Hmmm, I see a significant price increase for Regional fares in the future if Amtrak goes the Hitachi route.
     
  19. Nov 4, 2019 #194

    Gemuser

    G

    Gemuser

    Service Attendant

    Joined:
    Jul 14, 2012
    Messages:
    113
    Location:
    Sydney, Australia
    While this used to be true, these days the standard EMUs from European manfactures [don't know about Asian ones] tend to be quadri mode or very near, straight out of the factory. Dual power ones [electric/desiel] are another matter, although they do exist.
     
    jis likes this.
  20. Nov 4, 2019 #195

    PVD

    P

    PVD

    Conductor AU Supporter

    Joined:
    Jul 8, 2015
    Messages:
    4,240
    Location:
    NYC/Queens
    I don't think it's changed that much, but others are more willing to deal with it. Dealing with multiple voltages and frequencies is clearly manageable, ACS-64 do it everyday, but it is a "complicating factor"
     
  21. Nov 4, 2019 #196

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,235
    Location:
    Space Coast, Florida, Area code 3-2-1
    Since everything becomes DC on the main link, the frequency thing only affects the transformer as does the HV input voltage The backend drive control remains the same no matter how many different input profiles you throw at it. Indeed DC input is the biggest pain to deal with unless it is at the link voltage.
     
    JustOnce likes this.
  22. Nov 4, 2019 #197

    TC_NYC

    T

    TC_NYC

    Train Attendant

    Joined:
    Nov 2, 2015
    Messages:
    49
    I just don't see too many advantages of a dual mode locomotive. Amtrak will still schedule the trains to stop in Washington for 20-30 minutes and the Acela will still be billed as the "premium" service. EMUs would make a lot of sense, since the trains have frequent stops.
     
  23. Nov 4, 2019 #198

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,293
    Location:
    South Carolina
    I’ve said it before and I’ll say it now. ÖBB/ĆD Railjets would make a lot of sense. Great trainsets that are semi permanently coupled meaning you could add cars at any time, and take them out. And you can just change the engine in DC between whatever Amtrak starts using on the Virginia regionals in the next few years, and the sprinters. To be honest I find the Railjets a superior train to most high speed trains out there and I want to say they are capable of 150 mph.

    But what do I know about trains, it’s not like I was an airline executive.
     
  24. Nov 4, 2019 #199

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,235
    Location:
    Space Coast, Florida, Area code 3-2-1
    Railjets use basically the same Viaggio cars as Brightline.
     
    Pere Flyer and frequentflyer like this.
  25. Nov 4, 2019 #200

    PerRock

    PerRock

    PerRock

    Conductor

    Joined:
    Sep 17, 2006
    Messages:
    1,842
    Location:
    Ann Arbor, MI
    And the new trainsets for the Midwest, Cali & VIA.

    peter
     

Draft saved Draft deleted

Share This Page



arrow_white