North Carolina DOT's 10 Year Plan (8/13/2019)

Discussion in 'Commuter Rail and Rail Transit Discussion' started by jis, Aug 14, 2019.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

  1. Aug 14, 2019 #1

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,243
    Location:
    Space Coast, Florida, Area code 3-2-1
  2. Oct 25, 2019 #2

    AmtrakWPK

    A

    AmtrakWPK

    Conductor AU Supporter Honored Member

    Joined:
    Jun 19, 2004
    Messages:
    1,848
    Did a real superficial scan of that. Found this - there is undoubtedly more.

    ------------------------------------------------------------------------------------------------
    Passenger Rail Projects, CSX A-Line Halifax Northampton P-5741 R171422.

    DESCRIPTION: Construct New Main Track A80.7-A82.4, including rehabilitation of CSX SA-Line bridge over Roanoke River.
    New connection btwn A-Line & SA-Line at MP A-80.7. Reconstruct main track btwn MP A-82.4 and MP A-84.7. Create Second Main.
    -----------------------------------------------------------------------------------------------

    Thought that was interesting. Will look further through that document when I have time.
     
  3. Oct 28, 2019 #3

    Seaboard92

    Seaboard92

    Seaboard92

    Conductor

    Joined:
    Dec 31, 2014
    Messages:
    3,301
    Location:
    South Carolina
    That’s referring to the abandoned Seaboard bridge you see on the right going northbound at Weldon. Very interesting. That line itself joined the S line at Norlina and then onto Raleigh and points south. Going east it went to Portsmouth, VA
     

Draft saved Draft deleted

Share This Page



arrow_white