FRA Approves Environmental Study for DC2RVA Rail Project

Discussion in 'Amtrak Rail Discussion' started by jis, Sep 11, 2019 at 9:20 PM.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

  1. Sep 11, 2019 at 9:20 PM #1

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    24,565
    Location:
    Space Coast, Florida, Area code 3-2-1
    https://content.govdelivery.com/accounts/VADRPT/bulletins/25e44bf

     
  2. Sep 12, 2019 at 1:16 AM #2

    Ziv

    Z

    Ziv

    OBS Chief

    Joined:
    Oct 25, 2011
    Messages:
    543
    Nice. Now if they will actually fund the Long Bridge expansion/construction/renovation and the new trackage from the bridge, and to the south of DC, they will be moving in the right direction.
     
    JustOnce likes this.
  3. Sep 13, 2019 at 12:25 AM #3

    west point

    w

    west point

    Conductor

    Joined:
    Jun 10, 2015
    Messages:
    1,816
    If the whole project including the overpasses is built then it will be very easy to 4 track the line from the intersection of the Va ave /Amtrak 1st ave tunnels - and Alexandria That gives Amtrak and VRE ability to add trains both on the CSX and NS lines.
     

Share This Page

arrow_white