FRA Approves Environmental Study for DC2RVA Rail Project

Discussion in 'Amtrak Rail Discussion' started by jis, Sep 11, 2019.

Amtrak Unlimited Discussion Forum

Help Support Amtrak Unlimited Discussion Forum:

  1. Sep 11, 2019 #1

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    25,243
    Location:
    Space Coast, Florida, Area code 3-2-1
    https://content.govdelivery.com/accounts/VADRPT/bulletins/25e44bf

     
  2. Sep 12, 2019 #2

    Ziv

    Z

    Ziv

    OBS Chief

    Joined:
    Oct 25, 2011
    Messages:
    554
    Nice. Now if they will actually fund the Long Bridge expansion/construction/renovation and the new trackage from the bridge, and to the south of DC, they will be moving in the right direction.
     
    JustOnce likes this.
  3. Sep 13, 2019 #3

    west point

    w

    west point

    Conductor

    Joined:
    Jun 10, 2015
    Messages:
    1,901
    If the whole project including the overpasses is built then it will be very easy to 4 track the line from the intersection of the Va ave /Amtrak 1st ave tunnels - and Alexandria That gives Amtrak and VRE ability to add trains both on the CSX and NS lines.
     

Draft saved Draft deleted

Share This Page



arrow_white