    https://www.viarail.ca/en/about-via-rail/governance-and-reports/dedicated-tracks

     
  2. Jul 5, 2018 #2

    cpotisch

    cpotisch

    cpotisch

    Conductor

    Joined:
    Sep 2, 2017
    Messages:
    7,513
    Location:
    Brooklyn, NY
    Finally! Glad to see VIA might actually be taking interest in OTP and reduced emissions.
     
  3. Jul 6, 2018 #3

    railiner

    railiner

    railiner

    Conductor

    Joined:
    Mar 20, 2009
    Messages:
    7,039
    Location:
    Queens, NY
    Read their RFP outline, and this stood out to me... " More fuel-efficient, Tier 4 Diesel engines, with the option to operate on electrified rail infrastructure as it becomes available."

    Sound like any equipment you know? [​IMG]
     
  4. Jul 6, 2018 #4

    cpotisch

    cpotisch

    cpotisch

    Conductor

    Joined:
    Sep 2, 2017
    Messages:
    7,513
    Location:
    Brooklyn, NY
    P32AC-DMs? ALP45-DPs? I'm blanking.
     
  5. Jul 6, 2018 #5

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    23,882
    Location:
    Space Coast, Florida, Area code 3-2-1
    Neither of those two are Tier-4 AFAIK. Indeed NJT bent the rules to the limit to get under the bar for Tier-3 for the ALP45-DPs. There is an effort afoot to upgrade the 45's to Tier 4 since NJT wants to order some additional number of units, and they cannot sneak by on Tier-3 anymore.

    I don;t think P32s even meet Tier-3.

    Railner may be alluding to a development based on the SC-44/ACS-64
     
    railiner likes this.
  6. Jul 6, 2018 #6

    cpotisch

    cpotisch

    cpotisch

    Conductor

    Joined:
    Sep 2, 2017
    Messages:
    7,513
    Location:
    Brooklyn, NY
    So does a dual mode Charger seem likely anytime soon?
     
  7. Jul 6, 2018 #7

    jis

    jis

    jis

    Conductor AU Lifetime Supporter Gathering Team Member

    Joined:
    Aug 24, 2003
    Messages:
    23,882
    Location:
    Space Coast, Florida, Area code 3-2-1
    NYSDOT has allegedly working with Siemens for such a beast to replace all the P32AC-DMs (Amtrak and MNRR) and the LIRR DE/DMs. But for obvious reasons this particular project is focused on third rail electrification only.

    OHE is a different matter since it drags in a large heavy transformer and one or two heavy pantographs with it. Beyond that the rest is pretty much the same.
     