John Bobinyec Engineer AU Supporting Member Joined Sep 18, 2009 Messages 2,022 Location CYN Feb 18, 2019 #1 Is any work being scheduled this year which would necessitate Amtrak trains using Grand Central Terminal? jb
Is any work being scheduled this year which would necessitate Amtrak trains using Grand Central Terminal? jb
Thirdrail7 Engineer Joined Jul 9, 2014 Messages 4,542 Feb 19, 2019 #2 Nothing is firmed up yet, but it looks unlikely. Most of the stuff that is planned is on the high side or can worked around with pull/pull operation.
Nothing is firmed up yet, but it looks unlikely. Most of the stuff that is planned is on the high side or can worked around with pull/pull operation.
Thirdrail7 Engineer Joined Jul 9, 2014 Messages 4,542 Mar 9, 2019 #3 A few shifts are being explored. It may be GCT or outright cancellation of one or two. We'll see. Look for less LIRR and NJT trains as well. Last edited by a moderator: Mar 9, 2019
A few shifts are being explored. It may be GCT or outright cancellation of one or two. We'll see. Look for less LIRR and NJT trains as well.