jis
Permanent Way Inspector
Staff member
Administator
Moderator
AU Supporting Member
Gathering Team Member
I found this very nice consolidated article on the NJ upgrades of the NEC in the Railway Age:
http://www.railwayage.com/index.php/passenger/high-performance/hsr-in-the-northeast-what-next.html
Good to understand the tradeoffs that were made to come up with the final design, and also to compare what was actually built with what the final design was, and how the final result may have been modified to address issues that came up.
Note that this article is a consolidation of three articles published in the second half of 2015.
http://www.railwayage.com/index.php/passenger/high-performance/hsr-in-the-northeast-what-next.html
Good to understand the tradeoffs that were made to come up with the final design, and also to compare what was actually built with what the final design was, and how the final result may have been modified to address issues that came up.
Note that this article is a consolidation of three articles published in the second half of 2015.
Last edited by a moderator: