Empire Builder Timekeeping Struggles This Summer


  • Please log in to reply
199 replies to this topic

#1 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 29 June 2018 - 11:58 AM

I have taken the Builder 4 times now over the past two months.  Once, the train arrived at our destinations close to on time and 3 times the train was 2 or more hours late.   The BNSF track work really appears to be taking its toll on any decent time keeping, especially as the train heads thru MT and ND.   #8 currently on the Hi-Line is now over 9 hours late, so it will miss all connections in CHI, again.   #7 heading West thru this same area is only doing modestly better.    Hopefully the BNSF track work will wrap up by early fall as scheduled, but the damage has been done, as most travelers this summer appear to be experiencing significant delays on their journeys.  

I know the track work is very important, but it just seems to me that this summer's efforts have really impacted the Amtrak trains on this route more so than in previous summers.   Somewhat ironic, since the weather has been fairly benign along the entire route so far and has not been a factor.  



#2 Josh M

Josh M

    Train Attendant

  • Training
  • Pip
  • 27 posts
  • Gender:Male
  • Location:Ferndale, MI

Posted 29 June 2018 - 01:22 PM

I'm on that super delayed #8 right now. People are very...grumpy. To be fair, though, a large amount of the delay for this particular train was weather-related. We were running about 2-3 hours behind coming out of Glacier yesterday, but then that nasty line of storms blew up in front of us. They put speed restrictions on us through much of eastern Montana and into western North Dakota; the Williston station had no power when we pulled in just after midnight. It only got worse this morning due to all the damage in the eastern part of ND. We sat at Michigan, ND, for over an hour because of the slow downs caused by knocked out signals, crossing gates, and track inspections. So much for my fun final night of vacation in Chicago!


  • cpotisch likes this
Amtrak trains taken: Blue Water (LPE-PTH & PTH-LPE); Northeast Regional (BAL-NYP & NYP-BAL); Wolverine (PNT-CHI & CHI-ROY); California Zephyr (CHI-EMY & EMY-CHI)
 
Other trains taken: Algoma Central (Agawa Canyon Tour Train); Algoma Central (Sault Ste. Marie-Hearst & Hearst-Sault Ste. Marie); Cumbres & Toltec Scenic Railway; MARC (BAL-WAS & WAS-BAL); SEPTA (Wynnewood-PHL & PHL-Wynnewood)

#3 west point

west point

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,601 posts

Posted 29 June 2018 - 01:25 PM

There may be several factors causing these delays.

1.  RR may be worried about early onset of winter causing need to have long day time work windows ? Maybe even night time ?

2.  Work areas require stopping or at least slowing trains going thru ?

3.  Every end of an existing siding or end of double track requires that that section out of service for new switch installation and proper surfacing.  Then slow order until proper settling.  Is a pre assembled turn out set(s) available or does have to be stick built ?

4.  Worse a new switch on single track to the extension takes track out of service for same reasons as #3.

5.  Signal work installing CP for new track.

a.    Is  equipment available for new signaling ?  Bungalows, switch machines, signal poles and lights, wire and conduit.

b.   PTC installation or updates due to different 

6.  Changes in CP locations to increase future fluidity requiring #3,4,5,



#4 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 29 June 2018 - 03:52 PM

I'm on that super delayed #8 right now. People are very...grumpy. To be fair, though, a large amount of the delay for this particular train was weather-related. We were running about 2-3 hours behind coming out of Glacier yesterday, but then that nasty line of storms blew up in front of us. They put speed restrictions on us through much of eastern Montana and into western North Dakota; the Williston station had no power when we pulled in just after midnight. It only got worse this morning due to all the damage in the eastern part of ND. We sat at Michigan, ND, for over an hour because of the slow downs caused by knocked out signals, crossing gates, and track inspections. So much for my fun final night of vacation in Chicago!

Wow, gosh, what a mess.   It sounds like the weather played even more of a role than the track work in causing the delays.  Safety is always paramount.



#5 west point

west point

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,601 posts

Posted 29 June 2018 - 07:50 PM

Another problem is the early spring thaws that cause uneven track and related slow orders.  As the ground settles then slow orders can be lifted.



#6 bratkinson

bratkinson

    Lead Service Attendant

  • Members
  • PipPipPip
  • 243 posts

Posted 30 June 2018 - 04:29 PM

When I rode #28 PDX-CHI this past April, there was a substantial stretch of track in ND that had significant standing water on one or both sides, suggesting heavy rains within the past week or so.  It was annoying to be gently swaying back and forth at 30mph on what could only be described as 'spongy' track.  I think it was nearly 2 hours of slow orders.  Then as 'advertised', we went from almost on time (lots of padding into MSP) to 1 hour late leaving LaCrosse, where they held us at  the station until we actually were an hour late.  CP was had numerous crews at a number of highway crossings working on the gates, etc, and other crews at the start and end of some double track segments until Wisconsin Dells or so.  I'm often amused how some passengers get all upset because of slow orders and work zones on the railroad, especially during the summer.  I tell them that just like 'fix the roads' time happens in summer, so does 'fix the tracks'.  That generally reduces their anger...


  • Gingorn likes this

#7 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 14 July 2018 - 12:25 PM

We going to be using the EB on a couple of trips in August and while I was hoping the track work and other issues would have at least settled down a bit by then, it appears the timekeeping is now getting so bad that the EB's are turning around in SEA and PDX several hours late many days and this, coupled with the track work, fires and weather delays being experienced along the route, are really taking their toll on any semblance of a schedule.   I got a wee bit of a chuckle after reading how interesting the ride was thru parts of Washington and ID during the day going eastbound, since in the past riders almost never saw any of this terrain because the trains went thru these areas at night.  Now they are regularly going thru during the daylight hours.  I spoke with one of the folks at our local station recently and he said that they are reminding passengers now that the EBs will likely be anywhere from 3 to 8 hours late thru at least September and to not count on making any connections.   



#8 neroden

neroden

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 6,732 posts
  • Gender:Not Telling
  • Location:Ithaca, NY
  • Interests:Please feel free to moderate my posts

Posted 15 July 2018 - 06:31 AM

I guess I was lucky to travel in May: EB ran early in both directions.

Hopefully this trackwork blitz will "stick" and they'll be able to maintain things with routine maintenance rather than having months of delays again.
--Nathanael--

Please feel free to moderate my posts.

#9 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 15 July 2018 - 08:40 AM

I wonder what happened to #8, still on the Hi-Line and now running over 11 hours behind schedule?    Hopefully that was a "one-off" issue.   

My BNSF contacts here in MT have been somewhat surprised at the extent of EB delays this summer.  They knew the track work would cause some issues (they were thinking more on the order of a couple of hours each direction), but the extent of the delays on a regular basis has even surprised them, although not quite as bad as several years ago (when I was on EBs that were 12+ hours late several times).    The suggestion was made to Amtrak officials that a second train set would be helpful out of SEA and PDX in order to minimize the Eastward bound delays, as was used during the major BNSF problems several years ago, but evidently Amtrak did not have the equipment to employ this time as they did then.    Still, more than 2 months of track work to go unfortunately, according to their schedule, so this summer season will have long passed before things get a good deal better.    I was also told that next summer will feature a similar work schedule on different sections of tracks on this route.   Rats.



#10 JayPea

JayPea

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 3,722 posts
  • Gender:Male
  • Location:Colfax, WA (CFX)
  • Interests:Trains, photography, reading. And any combination thereof. :)

Posted 15 July 2018 - 08:54 AM

A big problem with #8 was that #28 was veeeerrrry late into Spokane for a variety of reasons. 7/27 ran very late the day before into Seattle and Portland, so were delayed by a few hours to begin with. Then near Spokane, a freight had a car with a broken drawbar, resulting in a backlog of freights from Pasco to Spokane. And when delays of this magnitude occur, of course, late trains get later. I will be taking the EB back to Spokane from Chicago in late August; the selfish part of me hopes it's several hours late so that I can get a decent night's sleep rather than schlepping off at Spokane at 0 dark 30 and then having to make the hour's drive home. The practical side of me, however realizes the world doesn't revolve around me (though it should!😋) so that part of me hopes delays are minimal to non-existent.
  • cpotisch likes this
Amtrak Miles and Trains Traveled: 89811-City of New Orleans, State House/Lincoln Service, California Zephyr, Southwest Chief, Empire Builder, Cascades, Crescent, Capital Limited, Coast Starlight, Texas Eagle/Sunset Limited, Silver Meteor, Lake Shore Limited,  Pacific Surfliner, Cardinal, Vermonter, Northeast Regional, Downeaster, Heartland Flyer, Wolverine. 
Pre-Amtrak Miles Traveled: 8478-- North Coast Limited, Panama Limited, Empire Builder, Abraham Lincoln, City of Hinkle

#11 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 20 July 2018 - 04:27 PM

I would like to know how Amtrak figures how much time a train can make up once it is late?    For example Train 8(19) is now almost 5 hours behind, chugging along  thru Western MT, yet when you look at Amtrak's status for arrival in CHI tomorrow, it shows the train arriving 7 minutes early.  I have been on dozens and dozens of Builders over the years and I can say with certainty that once a train is 5 hours late there is no chance to make up that much time before arriving in CHI.   I will be surprised if it is less than 2.5 or 3 hours behind tomorrow PM.  

It would be much more helpful if whatever formula they are using is more reflective of real world conditions rather than some optimum situation where everything perfectly aligns for the Amtrak trains on the Host Railroad's tracks.   



#12 cpotisch

cpotisch

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 4,642 posts
  • Gender:Male
  • Location:Brooklyn, NY
  • Interests:Planes, Trains, Cooking, Politics

Posted 20 July 2018 - 05:42 PM

I would like to know how Amtrak figures how much time a train can make up once it is late?    For example Train 8(19) is now almost 5 hours behind, chugging along  thru Western MT, yet when you look at Amtrak's status for arrival in CHI tomorrow, it shows the train arriving 7 minutes early.  I have been on dozens and dozens of Builders over the years and I can say with certainty that once a train is 5 hours late there is no chance to make up that much time before arriving in CHI.   I will be surprised if it is less than 2.5 or 3 hours behind tomorrow PM.  

It would be much more helpful if whatever formula they are using is more reflective of real world conditions rather than some optimum situation where everything perfectly aligns for the Amtrak trains on the Host Railroad's tracks.   

If they "gun it" between stations and spend less dwell time at smoke stops, they can make up a lot of time en route. It's when the train gets caught behind freights, has to restock, has to get a new crew, etc, that delays snowball and they just can't make up the time.


Routes Traveled: Silver Meteor, Silver Star, CrescentLake Shore LimitedCalifornia Zephyr, Sunset Limited, Texas EagleEthan Allen Express, Empire Service, Maple Leaf, AdirondackAcela Express, Northeast RegionalKeystone Service, Downeaster w/ Great Dome
 
Wish List: Auto Train, Cardinal, CONO, Empire Builder, Southwest Chief, Crescent (overnight), Adirondack w/ Great Dome


#13 railiner

railiner

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 6,671 posts
  • Gender:Male
  • Location:Queens, NY
  • Interests:All public transportation....land, sea, and air

Posted 20 July 2018 - 08:14 PM

Posting a "mark" for a late running train, especially at an intermediate point, has always been a tricky "art".   You have to figure the very best amount of time the train can possibly make up.  If you don't, and post a more 'realistic' time, and the train does surprise you and make up the time...then you may have to delay its departure, so that those relying on your mark don't end up missing it.   As the train gets closer and closer, you can get a more accurate estimate, and revise the time accordingly.   But every time you do that, you will be greeted with a chorus of groans, and more flak from angry passenger's who are waiting, and feeling like they are being "nickle and dimed"...

Of course posting the time at the end of the line doesn't matter as much, except for those waiting for their loved ones, who want to be sure to be there when it arrives.


metroblue?

okay on the blue!

#14 pennyk

pennyk

    Engineer

  • Admin
  • PipPipPipPipPipPip
  • 7,838 posts
  • Gender:Female
  • Location:Orlando, FL

Posted 20 July 2018 - 09:14 PM

Today's (7/20) Captiol Limited train 30 was held about 50 minutes for a late Empire Builder.  The connecting passengers boarded cross platform from track 30 to 28.


Amtrak miles: 248,633; Routes: Silver Meteor, Champion, Silver Star, Auto Train, Capitol Limited, Empire Builder, Lakeshore Limited, Adirondack, Vermonter, Cardinal, California Zephyr, Coast Starlight, Texas Eagle, Missouri River Runner, Acela Express, Southwest Chief, Cascades, Crescent, City of New Orleans, Hiawatha Service, Maple Leaf, Keystone Service, NE Regional, Downeaster, Piedmont, Carolinian, Lincoln Service, Autumn Express 2013, 2015, 2016, 2017, Empire Service, Sunset Limited, San Joaquin, Capitol Corridor, Pennsylvanian, Illinois Zephyr, Carl Sandburg, Ethan Allen Express, AEM-7 Excursion, Pacific Surfliner, Palmetto.  VIA miles: 4,584; Routes: The Canadian, Ocean; Alaska RR Denali Star: 356 miles


#15 Thirdrail7

Thirdrail7

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 3,173 posts

Posted 20 July 2018 - 09:37 PM

I would like to know how Amtrak figures how much time a train can make up once it is late?   

 

This one of the pitfalls of automation. The status system is largely automated. It is no longer a matter of the agents in the field updating the stations with an eta. It is based upon the "pure" running time of the train versus the position of the train.  If the pure running time is within the limits of the recovery time, the status will reflect it.

 

 

 

 

It would be much more helpful if whatever formula they are using is more reflective of real world conditions rather than some optimum situation where everything perfectly aligns for the Amtrak trains on the Host Railroad's tracks.   

 

How would you expect an automated or even a human to provide concrete, advanced real time conditions when the railroad is fluid operation? It's not like the hosts have master schedule available so people monitoring the progress can know "it'll follow this train to here and this trains is scheduled to come out of this yard at this time every day."  How will anyone know what the dispatcher will decided to ruin or hold? How do we know how many trains they'll put in front of it or who will take the siding vs hold the main?   Maybe everything WILL align and the train will make up time. It has happened. I literally watched a train make up four hours on its run.  The whole system is an estimation.


  • jis, Triley, AmtrakBlue and 1 other like this

They say laughter is the best medicine. Obviously they never posted on AU.


#16 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 21 July 2018 - 10:07 AM

Thanks for the interesting comments all.    I fully agree it is indeed a crap shoot the further out in time one makes estimates, but I would hope Amtrak could come up with some formula that does better than the current one.    As a frequent Amtrak traveler I have found these estimates to be quite inaccurate.   My "gut" feelings, from travel experiences on various Amtrak routes are often closer to the mark.      Meanwhile #8 on the Hi-Line this morning is now well over 7 hours behind schedule.    And again Amtrak shows them making up all but 3 hours of the tardiness.   The way things are going for this train, even if everything went very well the rest of the way, this EB will likely roll into CHI between 5 and 6 hours behind schedule.   



#17 John Bobinyec

John Bobinyec

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,560 posts
  • Gender:Male
  • Location:CYN

Posted 22 July 2018 - 06:17 AM

8(20) is now almost 12 hours late out of Wolf Point, Montana.  That's got to be more than simple track work delays.

 

jb


LDS Been On:

 

Old: Phoebe Snow (EL), Montrealer (AT), Laurentian (D&H)

RBBB: St. Petersburg - W. Palm Beach, Lakeland - Atlanta, Baltimore - NYC, Rochester, NY - Hartford, Albuquerque - Salt Lake City, Denver - Chicago

Modern: Ocean (VIA), Silver Star, Capitol Limited, Texas Eagle, Autotrain, Carolinian, Southwest Chief, California Zephyr, Lake Shore Limited

 


#18 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,571 posts
  • Gender:Female
  • Location:Delaware

Posted 22 July 2018 - 06:49 AM

8(20) is now almost 12 hours late out of Wolf Point, Montana.  That's got to be more than simple track work delays.

 

jb

Freight derailment in Montana

 

http://www.kfyrtv.co...-488820541.html


Edited by AmtrakBlue, 22 July 2018 - 06:50 AM.


#19 montana mike

montana mike

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,511 posts
  • Gender:Male
  • Location:Whitefish, Montana
  • Interests:Skiing, golf, hiking, train trips!

Posted 22 July 2018 - 08:10 AM

The EB just can't catch a break this summer.   



#20 merkelman06

merkelman06

    Train Attendant

  • Training
  • Pip
  • 26 posts
  • Gender:Male

Posted 22 July 2018 - 10:16 AM

Im on 7 (21) we were 35 minutes early into Minot yet will be several hours late departing waiting for the inbound crew off of #8 that will be almost 13 hours late.

We were moved off of the main line onto a side track where we sit waiting on a new rested crew.