Jump to content




Help Support AmtrakTrains.com by donating using the link above or becoming a Supporting Member.

Photo

Newark, DE station construction to begin


  • Please log in to reply
12 replies to this topic

#1 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,492 posts
  • Gender:Female
  • Location:Delaware

Posted 31 May 2018 - 06:31 AM

http://www.newarkpos...ad39bb1286.html
  • CraigDK likes this

#2 jis

jis

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 22,517 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 31 May 2018 - 08:50 AM

Considering that this is slated to become a transfer station between MARC and SEPTA, this is an even more important project than one would initially imagine.


  • AmtrakBlue likes this

#3 cpotisch

cpotisch

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 4,180 posts
  • Gender:Male
  • Location:Brooklyn, NY
  • Interests:Planes, Trains, Cooking, Politics

Posted 31 May 2018 - 09:20 AM

Considering that this is slated to become a transfer station between MARC and SEPTA, this is an even more important project than one would initially imagine.

Why does MARC need this new station built in order to get Newark? I didn't see anything in the article about adding tracks or capacity, so what's so special here? Whatever be the case, I'm pretty excited to be able to take commuter rail all the way to D.C. In fact, it'll be possible to get all the way to Fredericksburg by commuter rail.

Routes Traveled: Silver Meteor, Silver Star, CrescentLake Shore LimitedCalifornia Zephyr, Sunset Limited, Texas EagleEthan Allen Express, Empire Service, Maple Leaf, AdirondackAcela Express, Northeast RegionalKeystone Service, Downeaster w/ Great Dome
 
Wish List: Auto Train, Cardinal, CONO, Empire Builder, Southwest Chief, Crescent (overnight), Adirondack w/ Great Dome


#4 jis

jis

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 22,517 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 31 May 2018 - 09:30 AM

Who said anything about MARC needing a complete new station to be built?

 

The obstacles to MARC coming to Newark DE is completion of more complete high level platforms on both sides of the ROW and the fact that MARC wants Delaware to cover the operating cost in Delaware, and Delaware not being quite sure if they want to find the money for that yet. These issues will possibly take longer to resolve than for the new station building to be built, which was going to happen anyway, MARC or not. Of course the platform issue is somewhat tied with the new station construction too.


Edited by jis, 31 May 2018 - 09:31 AM.

  • cpotisch likes this

#5 neroden

neroden

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 6,699 posts
  • Gender:Not Telling
  • Location:Ithaca, NY
  • Interests:Please feel free to moderate my posts

Posted 08 June 2018 - 08:38 AM

Finally getting high-level platforms and ADA access is a big deal, and they are actually cleaning up the track layout (getting freight out of the way) which should provide some more throughput.
--Nathanael--

Please feel free to moderate my posts.

#6 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,492 posts
  • Gender:Female
  • Location:Delaware

Posted 08 June 2018 - 11:42 AM

Finally getting high-level platforms and ADA access is a big deal, and they are actually cleaning up the track layout (getting freight out of the way) which should provide some more throughput.

It already has a high level platform for SEPTA.
Not sure this station will be used for Amtrak, at least not until they install a platform between the tracks (I think that’s on the agenda).

#7 jis

jis

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 22,517 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 08 June 2018 - 11:57 AM

 

Finally getting high-level platforms and ADA access is a big deal, and they are actually cleaning up the track layout (getting freight out of the way) which should provide some more throughput.

It already has a high level platform for SEPTA.
Not sure this station will be used for Amtrak, at least not until they install a platform between the tracks (I think that’s on the agenda).

 

Newark DE is already served by Amtrak. Has been for a long long time. Are they planning to discontinue that?



#8 cpotisch

cpotisch

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 4,180 posts
  • Gender:Male
  • Location:Brooklyn, NY
  • Interests:Planes, Trains, Cooking, Politics

Posted 08 June 2018 - 12:13 PM

redacted


Edited by cpotisch, 08 June 2018 - 12:19 PM.

Routes Traveled: Silver Meteor, Silver Star, CrescentLake Shore LimitedCalifornia Zephyr, Sunset Limited, Texas EagleEthan Allen Express, Empire Service, Maple Leaf, AdirondackAcela Express, Northeast RegionalKeystone Service, Downeaster w/ Great Dome
 
Wish List: Auto Train, Cardinal, CONO, Empire Builder, Southwest Chief, Crescent (overnight), Adirondack w/ Great Dome


#9 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,492 posts
  • Gender:Female
  • Location:Delaware

Posted 08 June 2018 - 12:17 PM

 

Finally getting high-level platforms and ADA access is a big deal, and they are actually cleaning up the track layout (getting freight out of the way) which should provide some more throughput.

It already has a high level platform for SEPTA.
Not sure this station will be used for Amtrak, at least not until they install a platform between the tracks (I think that’s on the agenda).
 
Newark DE is already served by Amtrak. Has been for a long long time. Are they planning to discontinue that?
They don’t use the track next to the current platform on that side (northbound). As far as I know the pax have to cross over track 1 for north/east bound Amtrak trains.

#10 jis

jis

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 22,517 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 08 June 2018 - 12:25 PM

But the station is served. Are you saying that they plan to stop serving it pending construction of high platform between the tracks? I am just trying to figure out exactly what is being communicated.



#11 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,492 posts
  • Gender:Female
  • Location:Delaware

Posted 08 June 2018 - 01:30 PM

But the station is served. Are you saying that they plan to stop serving it pending construction of high platform between the tracks? I am just trying to figure out exactly what is being communicated.

Trying to convey that Amtrak doesn’t currently use the high platform where the new station is being built because the pax have to cross track 1 to board on that side. The other side, next to the original station, is just asphalt - no high platform.

#12 jis

jis

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 22,517 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 08 June 2018 - 01:44 PM

But isn't the overall plan for Newark DE station to construct a high platform on the other side to? or did I misunderstand?

 

Incidentally there are only two trains a day at most in each direction that calls at Newark DE, so it is not essential to have all tracks have a platform on them. With the track realignment, it should be possible for eastbound Amtraks to use the current platform I thought. But I may be wrong of course.



#13 AmtrakBlue

AmtrakBlue

    Engineer

  • Gathering Team Member
  • PipPipPipPipPipPip
  • 10,492 posts
  • Gender:Female
  • Location:Delaware

Posted 08 June 2018 - 02:03 PM

But isn't the overall plan for Newark DE station to construct a high platform on the other side to? or did I misunderstand?
 
Incidentally there are only two trains a day at most in each direction that calls at Newark DE, so it is not essential to have all tracks have a platform on them. With the track realignment, it should be possible for eastbound Amtraks to use the current platform I thought. But I may be wrong of course.

I don’t remember which is why I mention “until”. I thought the platform was going to be in the middle.




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users