Northern Spirits down


  • Please log in to reply
11 replies to this topic

#1 bmjhagen9426

bmjhagen9426

    Conductor

  • Members
  • PipPipPipPipPip
  • 558 posts
  • Gender:Male
  • Location:Klamath Falls, Oregon
  • Interests:Computers, riding trains/travel, watching movies/sporting events, listening to music/speeches/talk radio, reading

Posted 10 June 2017 - 08:16 PM

If you can't tell from the title, the Northern Spirits (VIA Winnipeg-Churchill) has encountered an extended service disruption, effectively joining the Chaleur (VIA Montreal-Gaspe) on becoming a route being classified as "indefinetely suspended", according to a Facebook post from the Amtrak Fans group, due to the following reason: extensive damage. For the time being, residents of Churchill can only fly to get out, and sub-arctic tourism also took a big hit.


Trains taken (US): Coast Starlight, San Joaquins, Empire Builder, Southwest Chief, Hoosier State, SP4449 excursion 2015
Current Amtrak mileage: 20271 miles plus 130 Ambus miles

#2 NS VIA Fan

NS VIA Fan

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,054 posts
  • Gender:Male

Posted 11 June 2017 - 04:41 AM

Only the Gillam - Churchill portion of the route is suspended....but it is this section of the line where communities have little or no access other than the train.

VIA trains between Winnipeg - The Pas - Thompson - Gillam are still running.

http://www.newswire....-627562033.html

PS: The ‘‘Northern Spirits’ were a group of old 10&6 sleepers VIA had acquired from Amtrak and refurbished for service between Winnipeg and Churchill.....they have long since been retired. The train itself was known as the ‘Hudson Bay’ but after VIA eliminated most train names it's now just the Winnipeg-Churchill service.

#3 railiner

railiner

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 5,242 posts
  • Gender:Male
  • Location:Queens, NY
  • Interests:All public transportation....land, sea, and air

Posted 11 June 2017 - 11:09 AM

Sorry I delayed ever riding it...now who know's if I'll ever get the chance.   That leaved ONR's Polar Bear as the only train to reach a part of Hudson Bay (James Bay)...better ride that, while I can.... :mellow:


metroblue?

okay on the blue!

#4 Chessie

Chessie

    Lead Service Attendant

  • Members
  • PipPipPip
  • 139 posts
  • Gender:Not Telling

Posted 11 June 2017 - 06:01 PM

Should I take that "indefinitely suspended" means it is unlikely to come back?

#5 MikefromCrete

MikefromCrete

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 2,194 posts
  • Gender:Male
  • Location:Crete, IL

Posted 11 June 2017 - 06:44 PM

Should I take that "indefinitely suspended" means it is unlikely to come back?

 Nope. Ownership of the line in question is being transferred to a First Nations Tribe. One of their first concerns is providing service to communities along theline which lack road access. 


Edited by MikefromCrete, 11 June 2017 - 06:44 PM.


#6 Chessie

Chessie

    Lead Service Attendant

  • Members
  • PipPipPip
  • 139 posts
  • Gender:Not Telling

Posted 11 June 2017 - 08:48 PM

Should I take that "indefinitely suspended" means it is unlikely to come back?

 Nope. Ownership of the line in question is being transferred to a First Nations Tribe. One of their first concerns is providing service to communities along theline which lack road access.

Oh, good! Thanks for the info. :)

#7 MikefromCrete

MikefromCrete

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 2,194 posts
  • Gender:Male
  • Location:Crete, IL

Posted 19 June 2017 - 05:53 PM

 

 

Should I take that "indefinitely suspended" means it is unlikely to come back?

 Nope. Ownership of the line in question is being transferred to a First Nations Tribe. One of their first concerns is providing service to communities along theline which lack road access.

Oh, good! Thanks for the info. :)

 

 

Of course, a big part of the line now has been wiped out by a flood, with a five-car VIA train trapped at Churchill, so it might be quite a while before any service is reinstated, but I believe the local residents want the line restored as soon as possible, since it is a lifeline for both Churchill and all the towns along the route. The Canadian government may have to pony up a lot of money to restore the line before or after its transfer to the First Nations group. 



#8 Train2104

Train2104

    Conductor

  • Members
  • PipPipPipPipPip
  • 868 posts
  • Gender:Male
  • Location:New York

Posted 21 June 2017 - 09:16 PM

Should I take that "indefinitely suspended" means it is unlikely to come back?

 Nope. Ownership of the line in question is being transferred to a First Nations Tribe. One of their first concerns is providing service to communities along theline which lack road access. 

From what I gather, the ridership on the portion south of Thompson, where there is road access, is abysmal. Would not be surprised if it's reduced.

#9 bretton88

bretton88

    Conductor

  • Members
  • PipPipPipPipPip
  • 661 posts

Posted 23 June 2017 - 08:06 AM

Should I take that "indefinitely suspended" means it is unlikely to come back?

 Nope. Ownership of the line in question is being transferred to a First Nations Tribe. One of their first concerns is providing service to communities along theline which lack road access. 
From what I gather, the ridership on the portion south of Thompson, where there is road access, is abysmal. Would not be surprised if it's reduced.
There's been a lot of thought that the train will eventually get truncated down to just Thompson to Churchill, possibly not run as a VIA train anymore.

If I won the lottery, I'd probably build a passenger from nowhere to nowhere.


#10 Heath Loxton

Heath Loxton

    Train Attendant

  • Training
  • Pip
  • 33 posts

Posted 13 July 2017 - 04:53 AM

Ahhh here we go... I have seen this sad old story many a time before!

 

Here is the story line:

1) Natural disaster or heavy use makes tracks unusable. 

2) Passenger service gets "suspended".

3) years go by with no passenger service.

4) The rail operator, government or other people say "its going to cost us too much to restart this train".

 

Here are some examples:

1) Amtrak gulf coast service.

2) Via Rail Gaspe service.

3) Via Rail Victoria BC service.

and now 4) Via rail Gillam to Churchill service.


Edited by Heath Loxton, 13 July 2017 - 04:53 AM.


#11 NS VIA Fan

NS VIA Fan

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,054 posts
  • Gender:Male

Posted 13 July 2017 - 05:48 AM

Ahhh here we go... I have seen this sad old story many a time before!
 
Here is the story line:
1) Natural disaster or heavy use makes tracks unusable. 
2) Passenger service gets "suspended".
3) years go by with no passenger service.
4) The rail operator, government or other people say "its going to cost us too much to restart this train".
 
Here are some examples:
1) Amtrak gulf coast service.
2) Via Rail Gaspe service.
3) Via Rail Victoria BC service.
and now 4) Via rail Gillam to Churchill service.


The only problem with your summary is…..Amtrak’s Gulf Coast, VIA Gaspe and VIA Victoria are all in well populated areas with good road and air access.

There is nothing between Gillam and Churchill so if the railway is not restored....perhaps it’s time to construct an all-weather road.

There is air service at Gillam and Churchill but even that was having problems this spring.

http://www.cbc.ca/ne...ights-1.4068080

Edited by NS VIA Fan, 13 July 2017 - 05:49 AM.


#12 zephyr17

zephyr17

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 3,314 posts
  • Gender:Male
  • Location:Washington State

Posted 13 July 2017 - 11:25 AM

Ahhh here we go... I have seen this sad old story many a time before!

 

Here is the story line:

1) Natural disaster or heavy use makes tracks unusable. 

2) Passenger service gets "suspended".

3) years go by with no passenger service.

4) The rail operator, government or other people say "its going to cost us too much to restart this train".

 

Here are some examples:

1) Amtrak gulf coast service.

2) Via Rail Gaspe service.

3) Via Rail Victoria BC service.

and now 4) Via rail Gillam to Churchill service.

Another difference is that the Gulf Coast track was restored within a year after Katrina and is in service as a freight route.  So there is really little infrastructure excuse (stations, maybe) not to restart service.

 

In all the other cases, the rail is not in serviceable condition and there is no freight service to support the rail infrastructure.


SP Coast Daylight, AT&SF San Diegan, AT&SF Super Chief, D&RGW Rio Grande Zephyr, Southwest Limited/Chief, San Diegan/Pacific Surfliner, San Joaquin, Cascades, California/San Francisco Zephyr, Coast Starlight, Empire Builder, Sunset Limited (LA-Orlando), Desert Wind, Pioneer, City of New Orleans, Silver Star, Silver Meteor, Lake Shore Limited, Cardinal, Hoosier State (Amtrak),  Hoosier State (Iowa Pacific), Ann Rutledge, Adirondack, Maple Leaf, NE Regional, Capitol Limited, Via Canadian (CP route), Via Super Continental, Via Atlantic Limited, Via Hudson Bay, Via Skeena, Via Canadian (CN route), Via "Corridor" (Toronto-Montreal), BC Rail Cariboo Dayliner, Eurostar, Thalys, DB, Netherlands Rail, Austrian Railways, BR, Korail (conventional), Korail KTX