Jump to content




Photo

LIRR: One Continuous Hour of Evening Rush Service @ Woodside (1/12/17)


  • Please log in to reply
2 replies to this topic

#1 Fan Railer

Fan Railer

    Conductor

  • Members
  • PipPipPipPipPip
  • 854 posts

Posted 16 January 2017 - 09:08 AM



#2 Palmetto

Palmetto

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 1,281 posts
  • Gender:Male
  • Location:Across the Rio Grande from Matamoros, MX

Posted 19 January 2017 - 07:38 AM

When did LIRR start using color-light type signals?  Interesting to see a restricting signal appear as the train goes by it.  Keeps things moving.



#3 jis

jis

    Engineer

  • Members
  • PipPipPipPipPipPip
  • 18,989 posts
  • Gender:Male
  • Location:Space Coast, Florida, Area code 3-2-1
  • Interests:Trains, Planes and Travel

Posted 19 January 2017 - 09:24 AM

I had seen a diagram of the new Control Points and the control center that will control them with the opening of the East Side Access. AFAIR almost everything upto Woodside will be controlled out of PSCC, also including the new CPs like Plaza controlling the access to ESA tunnels. If my recollection is correct then these new signals will be controlled out of PSCC.




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users