KmH
Engineer
How are the SAC station renovations going?
Is the ceiling of the waiting area still held up with a network of supports?
It looked like there was still lots to do when I was there in April.
I'm planning a trip that will require a 14 hour layover between the CS and the CZ in September '16.
Is the ceiling of the waiting area still held up with a network of supports?
It looked like there was still lots to do when I was there in April.
I'm planning a trip that will require a 14 hour layover between the CS and the CZ in September '16.
Last edited by a moderator: