Train Dispatcher
#2
Posted 07 January 2003 - 10:49 AM
Steve,Wow, I was working the SP route, now UP, south of Portland. Boy is dispatching hard. I had the entire mainline tied up on my first two tries. It will be awhile before I complain about shitty dispatching when I ride Amtrak.
Yes it can be frustrating being a dispatcher. It's certainly not an easy thing to do.
I personally don't blame the dispatchers themselves for some of the delays that Amtrak encounters. I blame the freight RR's for that. They are the ones that because of money saving measures have ripped up mainline track thereby creating that single mainline problem.
Also while I realize that it does cost money, had the freight RR's been properly investing in new technology, a dispatcher's job would be easier. In this day and age, we have computers that can quickly recalculate meets between trains in the event that one train gets delayed. These computers can also take into account the size of the trains vs. the size of the passing sidings. Something that you had to keep in your head while you were playing the game. I’m not sure just how many companies have invested in that type of equipment.
Additionally had the freight RR’s gone over to some form of PTC, a dispatcher’s job would be much easier. He would have the ability to know precisely where in the block a train is and how fast it’s moving. You can also have shorter blocks, meaning you can handle more trains. One example of this is currently under construction on the NEC in New Jersey.
A new high density PTC system is being installed between Newark, NJ and New York’s Penn Station. This is a double tracked distance of about 8 miles and currently can handle 18 trains per hour, in the peak direction. Once the new signal system is in place some time this year, they will be able to squeeze 25 trains per hour through that same stretch of track. Over the course of a normal rush hour, this new signal system will allow for almost a 50% increase in the number of trains into and out of Penn.
The real answer to Amtrak’s problems and the dispatcher’s is that this country needs a superfund for trains, just like the highways have. That money could fund double tracking and new signal systems, thereby increasing on time performance and capacity for both Amtrak and the freight RR’s.
As for your problems with TD, you can always adjust the game setting to lower the chance of a hotbox or dragging equipment problem. If you really want to be adventurous, you can go buy Track Builder and add a second mainline track. Of course both of those methods might be construed as cheating a little.
Now if you think that the sim you’ve currently got is frustrating, then go download the SKL Migraine Sub-division or “Sklmigra.exe” from the fictitious railroad section at the bottom of this page. You can also click here for a direct link to the file. This one will drive you nuts.
Take care and take trains!
#3
Posted 07 January 2003 - 07:36 PM
Also, I agree with all of your other remarks too about more money.
#5
Posted 29 January 2003 - 06:42 PM
The one thing everyone needs to remember is that on forums such as this, all it takes is a computer, connection and the ability to hit a few keys and you can become an instant expert! Isn't technology great?
#6
Posted 29 January 2003 - 06:55 PM
Train Dispatcher is available two ways. You can download for free the old version, which is TD 2. Just click here to go to the page. There is a library of free sims and a library that requires you to purchase the sim. There are still sims available that run in TD 2, although many of the free sims now require TD 3. The free sims can be found here.
If you like that, then you may wish to purchase the newer TD version 3. It's available on line for sure, and you may be able to find it in a hobby store but I'm not sure. You can also buy trackbuilder 3, which allows you to make your own sims. It's no where near as hard to learn as MS TS.
You can buy TD 3 here.
Take care and take trains!
#7
Posted 24 November 2003 - 11:02 PM
http://saveourtrainsmichigan.com/
Ride and support Amtrak.
BNSF Conductor
#8
Posted 25 November 2003 - 06:39 PM
The Chief-FSU Alumnus
Rail Miles Travelled: 75,914
The Chief on Youtube
#10
Posted 20 March 2008 - 05:40 PM
#12
Posted 22 March 2008 - 09:54 AM
Maybe in a few weeks.If you need additional tester. I am available. Let me know.
I just finished adding the new fictitious North Brunswick station and the connection to MOM at Midway including a duck-under, and of course the requisite set of MOM trains.
Haven't done the morning inbound rush hour timetable yet. Just the evening outbound rush hour for now.
I am starting the stress TD3 now and getting close to some of its limits.
#13
Posted 03 May 2008 - 08:44 PM
does anyone know how to get a job doing train dispatching like up here in the boston area let me know?
Most of the MBTA Commuter Rail system is dispatched by MBCR; http://www.mbcr.net/jobs.html has their list of current job openings, which currently doesn't seem to include dispatching.
Amtrak dispatches all the tracks from South Station to Providence (and beyond that to New Haven); I don't know if the dispatchers for those tracks are even in Massachusetts.
The Framingham to Worcester tracks are dispatched by CSX; I don't think that dispatcher is in Massachusetts.
There are also some small freight railroads who may have dispatchers in Massachusetts.
#14
Posted 12 July 2008 - 06:21 AM
NEC from Boston to new Haven is dispatched out of CETC located in Boston.Amtrak dispatches all the tracks from South Station to Providence (and beyond that to New Haven); I don't know if the dispatchers for those tracks are even in Massachusetts.
That is probably dispatched out of CSX galactic headquarters in Jacksonville FL!The Framingham to Worcester tracks are dispatched by CSX; I don't think that dispatcher is in Massachusetts.
#15
Posted 16 July 2011 - 08:33 PM
#16
Posted 08 December 2011 - 09:42 PM
I just discovered this game, and find it strangely compelling. Naturally I had to try a section near home, and tried dispatching the Canadian Pacific between Minneapolis and Portage on a Sunday. Like the OP (eight years ago), I now have a much better appreciation for how difficult dispatching is. Try as I might, I still ended up putting the Empire Builder on a siding when it met an intermodal too long for the siding, and it ended up late into La Crosse. The shame!
I would try it, but as an engineer, I already KNOW I'm over qualified to be a dispatcher!
Reply to this topic
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users











